AWP for Front-End Planning

According to the Construction Industry Institute, owners, EPC firms and contractors regularly realize the performance and safety benefits of Advanced Work Packaging (AWP), with savings of up to 10% of the total installed cost of the project and productivity increase of up to 25% in the field. The higher the maturity of the AWP in a project, the greater the benefits. Successful organizations understand that to fully implement the AWP, you must start from the beginning of the project.

Fabricantes:
Category: Utilitários
Learn more about AWP for Front-End Planning

Request a Quote

What is AWP for Front-End Planning?

SET UP YOUR AWP IMPLEMENTATION FOR SUCCESS, STARTING WITH THE END IN MIND

According to the Construction Industry Institute, owners, EPC firms and contractors regularly realize the performance and safety benefits of Advanced Work Packaging (AWP), with savings of up to 10% of the total installed cost of the project and productivity increase of up to 25% in the field. The higher the maturity of the AWP in a project, the greater the benefits. Successful organizations understand that to fully implement the AWP, you must start from the beginning of the project.

WHY IT'S NECESSARY

The full AWP requires prior planning

Achieving all the benefits of the AWP requires the commitment to deliver the AWP process from the beginning of the project. Many Owners mistakenly see the AWP as something the Contractor needs to do.

The process of measuring lack of visibility can be difficult, especially when the results of this process have rear-facing delay indicators that are not apparent until the damage is done.

Point solutions

Professional service organizations have developed Excel or Access-based solutions that cannot be scaled.

WHAT IS INCLUDED

AWP MASTER INDEX

Maintain a master list of each work package, its core data, and associations to other packages in a tool created for this purpose

CONSTRUCTION DEVELOPMENT PATH

Define and track the development and sequencing of Construction Workareas (CWAs) and Construction Work Packages (CWPs)

AWP BEST PRACTICES

Define AWP best practices to adopt in your project by selecting them from a preconfigured library

WORK MANAGEMENT

Manage and group the scope for bidding and awarding contracts using best procurement practices

AWP HEALTH & ADOPTION METRICS

Automate the process of measuring health and adoption of selected best practices

INTERACTIVE PLANNING SESSION MANAGEMENT

Follow best practices with representation from all stakeholders

System requirements:

CPU: 1.8 GHz dual core processor

RAM: 2 GB

HDD / SSD: 50 GB of free space on the main drive

Operating system: Microsoft Windows 8 32-bit, Microsoft Windows 7 32-bit and Microsoft Windows Vista 32-bit

Resolution: 1024×768

You don't know what software you need or you haven't found what you were looking for?

You don't know what software you need or you haven't found what you were looking for? We have a team ready to help you choose the right software for your company.